Reference of Construction

Install Air shower for Clean room

Expansion canteen room & Construction toilet room

Renovation for Toilet (Mens&Womens)

Replace Plastic Floor tiles for Office

Construction for Car parking 120 Lots

Construction for Car parking by Asphalt concrete

Painting for Blue belt whole factory Area: 3,400 Sq.m

Construction for Chemicals storage room

Reference of Electrical Systems

Replace overhead for high voltage transformer yard

Thermos can and PM for DB Panel

Install inverter for pump and motor

Electrical Improve for School

Reference of Mechanical Systems

Preventive maintenance for Fire pump

Replace operation pipe and rack for Cooling tower

Replace Operation pipe for Cooling Tower

Auto Blowdown for Cooling Tower

Replace pump and repair motor for Chiller supply pump

Install Air Condition 240,000 BTU

Install Air Condition 240,000 BTU

Install tester for Chiller unit 12 Sets

Install Hot water transfer pipe (SUS304) Distrance: 60m.

Install pump and pipe transfer for Raw water: 1,100 meters

Replace motor for Air blower 5.5kW

Air duct and Air Blover clearing work

Vacuum Pump 22 kW

งานติดตั้งท่อส่งน้ำร้อน สแตนเลส304 ระยะทาง 60 เมตร

งานติดตั้งท่อส่งน้ำร้อน สแตนเลส304 ระยะทาง 60 เมตร

งานเปลี่ยนท่อระบบน้ำ DI เครื่องจักร

Reference fo Water and Waste water treatment plant

RO Watet treatment plant

Change RO membrane for RO Unit

CIP for RO membrane of RO Unit

Change media for Sand filter,Activated Carbon filter tank (RO Water treatment)

Replacement UV lamp for UV sterilizer unit: 10 Units

City water treatment skids: 10 ml/hr

RO Watet treatment plant

Cleaning and Disinfection for DI water plant

งานล้างเมมเบรนในระบบอาร์โอ

งานล้างเมมเบรนในระบบอาร์โอ

งานล้างเมมเบรนในระบบอาร์โอ

Test run for DI water treatment plant

Copyright © 2026 Sapco.co.,Ltd. - All rights reserved.